Customization: | Available |
---|---|
Application Fields: | New Energy |
Certification: | ISO |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Equipment name |
Dissolving acetylene equipment | Equipment name |
Low pressureacetylene equipment | |||||||||||
model | Open type | quantity | 1 set | |||||||||||
model | DFS series | |||||||||||||
Operation condition | ||||||||||||||
1 | Conveying medium | Acetylene gas | 7 | Operation condition | continous discontinous | |||||||||
2 | Reaction medium | calcium carbide | 8 | Deslagging mode | hand automatic | |||||||||
3 | Working tempt. | 10ºC-70ºC | 9 | Hydrating mode | once cycle | |||||||||
4 | Feeding mode | continous | 10 | Filling high pressure | ≤2.5MPa | |||||||||
5 | calcium carbide size | 10~200 | 11 | Low working pressure | 20KPa | |||||||||
6 | Cleaning mode | Sodium hypochlorite sulfuric acid | 12 | Drying mode | Molecular sieve mode | |||||||||
Install environment | ||||||||||||||
13 | Install place | indoor outdoor | 15 | |||||||||||
14 | environment | heating not heating | 16 | |||||||||||
Main part | ||||||||||||||
17 | Generator part | 21 | water seal part and reverse water seal part | |||||||||||
18 | Gas cabinet part | 22 | Purity and neutralize part | |||||||||||
19 | Low pressure drying part | 23 | Compressor part | |||||||||||
20 | High pressure drying part | 24 | Filling part | |||||||||||
Equipment part | ||||||||||||||
25 | One year 120000 m3 / one day 72pcs cylinders | |||||||||||||
testing | ||||||||||||||
33 | operation testing | 35 | function testing | |||||||||||
34 | gas pressure testing | 66 | water pressure testing | |||||||||||
supply | ||||||||||||||
37 | acetylene plant main part | 40 | valve flange | |||||||||||
38 | sealing washer | 41 | instrument meter | |||||||||||
39 | instruction and certification | |||||||||||||